14 Dec 2013

IMPORTANCE OF FINE TUNING IN A SPINNING MILL




In a 40s warp yarn manufacturing mill followings are major complaints
v Low production to the existing machines
v Execes labour requirement
v More power bill
v More soft waste generation
BY CLOSE OBSERVATION WE FOUND FOLLOWING DEFECTS
Ring frame
1.Excess end breaks 13 breaks/100spl hrs
2.More TM (4.5)
3.Lot of idles
Simplex
1.More breaks 12/100 spl hrs
Draw-frame
1.Frequent lappings
2.Coiler chockings
3.Creel breaks
4.More 0.5mts cv%

Carding
1.Frequent web fallings
2.Incorrect suction systems
3.Card to Card draft difference
CHANGES COMPARITION
RING FRAME (G5/1)
PARAMETERS
    BEFORE
 AFTER
REDUCTION
IN LABOUR &
COST/DAY
COUNT
40
40
SPEED (RPM)
13000
16500

12 Heads


3240 Rs
(RS 270/SHIF)
TPI & TM
28.46 & 4.5
25.93 & 4.1
EFFICIENCY (AVE)
78%
92%
GPS
64
106
INSTALLED SPLS
8064
8064
ACHIEVED PRODN/DAY
1548
2564
NO OF LABOURS/DAY
36
            24
SIMPLEX (LF 1400A)
PARAMETERS
   BEFORE
  AFTER
REDUCTION
IN LABOUR &
COST/DAY
SPEED (RPM)
 800
 1100
HANK
 1.10
1.3
TM & TPI
1.35 & 1.41
1.25 & 1.43

       4

    1080 Rs
NO MACHINES & SPLS
2 &288
2 &288
PRODUCTION EFFI
62%
83%
PRODUCTION/SHIFT
664Kgs
1020Kgs
HRS RUNNING
24
20
NO OF LABOURS/DAY
9
4
DRAW-FRAME (RSB)
PARAMETERS
BEFORE
AFTER

In this case required prodn more so runnig time higher
SPEED
650 MPM
510MPM
HANK
0.120
0.130
EFFICIENCY
55%
83%
PRODN/SHIFT
846 Kgs
925 Kgs
NO OF SHITS
3
3
Excess speed and coarser hank in D/F leads to more breaks in simplex & spinning. Also efficiency drop in D/F
CARDING
PARAMETERS
BEFORE
AFTER
Due to the finner Hk and more req of prodn working hours more
SPEED (Mpm)
60
100
HANK
0.100
0.120
EFFICIENCY
74%
93%
NO OF M/CS
5
5
PRODN/SHIFT
126
175
NO OF SHIFTS
630
875
WORKING HRS
20
24
v  Due to frequent web falling restricts higher speeds
v  Coarser hk leads to more neps and thick place
        LABOUR REQUIREMENT
DEPARTMENT
BEFORE
AFTER
MIXING
4 =4
2=2
BLOW ROOM
2×2=4
1×2=2
CARDING
1×3=3
1×3=3
DRAWING
1×3=3
1×3=3
SIMPLEX
3×3=3
2×3=3
RING FRAME
12×3=36
8×3=24
CONE WINDING&PKG
60Kgs/head
26+1 (Pkg)
85Kgs/head
30+1 (Pkg)
SWEEPERS
2×3=6
2×3=6
M/C CLEANING
-NIL-
6
TOTAL
86
73+6
LABOUR/KGS(Rs)
86×250÷1548=13.89
73×280÷2564=7.98(Excluding
Cleaning labours)

CONCLUTIONS
§  IN THIS MILL ALL PROBLEMS ARAISED DUE TO POOR MAINTANCE
§  AFTER FINISHING OF ALL TUNE UPS WE GET GOOD RESULTS
§  LABOUR WAGES/KG REDUCED FROM Rs13.89 TO Rs7.98 
§  ALSO LABOUR SHORTAGE TOTALLY ELIMINATED DUE TO WORKLOAD IMPLIMENTATION (2M/Cs / TENDER)

§  DAILY PRODUCTION RAISED FROM 1548Kgs TO 2564Kgs


FOR ASSISTANCE CALL +91-98342-79009 
& +91-99941-79009

No comments: