S.NO
|
PARTS TO BE INSPECTED
|
STD
|
RATING
(BEFORE)
|
RATING
(AFTER)
|
1.
|
Hank
|
|||
2.
|
Del spd
|
|||
3.
|
Settings
|
|||
4.
|
Total draft
|
|||
5.
|
BD&WD
|
|||
6.
|
No of Ends & Actual draft
|
|||
7.
|
Codn of 1st saddle
|
|||
8.
|
Codn of 2nd saddle
|
|||
9.
|
Codn of 3rd saddle
|
|||
10.
|
Top roller dia
|
|||
11.
|
Top roll condn
|
|||
12.
|
End bush condn
|
|||
13.
|
Top stripper condn
|
|||
14.
|
Bottom stripper condn
|
|||
15.
|
Flutted roller Brgs condn
|
|||
16.
|
Fn of suction systems
|
|||
17.
|
Fn of signal lamps
|
|||
18.
|
Fn of door limit switches
|
|||
19.
|
Fn of creel stop motion
|
|||
20.
|
Fn of drafting stop motion
|
|||
21.
|
Fn of cal roller stop motion
|
|||
22.
|
Fn of doors
|
|||
23.
|
Air leakages
|
|||
24.
|
Entry plate settings
|
|||
25.
|
Creel chain tension
|
|||
26.
|
Calender roller wheels
|
|||
27.
|
Coiling Formation
|
|||
28.
|
0.5Mts CV%
|
|||
29.
|
A%
|
DRAW FRAME AUDITING FORM
No comments:
Post a Comment