7 Jun 2013

RINGFRAME AUDITING FORM

RINGFRAME AUDITING FORM

                RINGFRAME AUDITING FORM
DATE;                                                             M/C NO;
S.NO
INSPECTED PARTS

BEFORE
AFTER
1.        



2.        
Spl spd


3.        
Ct, TM,&TPI


4.        
Break draft/W


5.        
Total draft/W


6.        
Drafting unit/Wheels


7.        
Gearend Wheels


8.        
Condensor allignment


9.        
Roller Settings


10.     
Apron centre&tension


11.     
Fluttd Roller Brg Condn


12.     
Grease nipples &covers


13.     
Top roller pressure


14.     
Top Roller dia &codn


15.     
Front top roller offset


16.     
Top roller stgs


17.     
Nose bar stgs


18.     
Lappet hook stgs


19.     
Fn of builder motion


20.     
Traveller clearer stgs


21.     
SPL &Lappet gauges


22.     
Lappet height gauges


23.     
Ring rail levl


24.     
Spl buttons


25.     
Cop content & Dia


26.     
Spl tape tensions


27.     
Spl tape allignment


28.     
Main belt condn


29.     
Tin roller Brg Lubrication


30.     
Spl oil levl


31.     
Total Idles


32.     
Count CV%


33.     
Strength CV%


34.     
Yarn CSP


35.     
Breaks/100Spl Hrs


                                          FOR ASSISTANCE CALL +91-98431-79009

2 Jun 2013

AUDITING FORM- DRAW FRAME



    DRAW FRAME AUDITING FORM    (+91-98431-79009)
S.NO
PARTS TO BE INSPECTED
STD
RATING
(BEFORE)
RATING
(AFTER)
1.        
Hank



2.        
Del spd



3.        
Settings



4.        
Total draft



5.        
BD&WD                           



6.        
No of Ends & Actual draft



7.        
Codn of 1st saddle



8.        
Codn of 2nd saddle



9.        
Codn of 3rd saddle



10.     
Top roller dia



11.     
Top roll condn



12.     
End bush condn



13.     
Top stripper condn



14.     
Bottom stripper condn



15.     
Flutted roller Brgs condn



16.     
Fn of suction systems



17.     
Fn of signal lamps



18.     
Fn of door limit switches



19.     
Fn of creel stop motion



20.     
Fn of drafting stop motion



21.     
Fn of cal roller stop motion



22.     
Fn of doors



23.     
Air leakages



24.     
Entry plate settings



25.     
Creel chain tension



26.     
Calender roller wheels



27.     
Coiling Formation



28.     
0.5Mts CV%



29.     
A%





DRAW FRAME AUDITING FORM