RINGFRAME AUDITING FORM
RINGFRAME AUDITING FORM
DATE;
M/C NO;
S.NO
|
INSPECTED
PARTS
|
BEFORE
|
AFTER
|
1.
|
|||
2.
|
Spl spd
|
||
3.
|
Ct, TM,&TPI
|
||
4.
|
Break draft/W
|
||
5.
|
Total draft/W
|
||
6.
|
Drafting unit/Wheels
|
||
7.
|
Gearend Wheels
|
||
8.
|
Condensor allignment
|
||
9.
|
Roller Settings
|
||
10.
|
Apron centre&tension
|
||
11.
|
Fluttd Roller Brg Condn
|
||
12.
|
Grease nipples &covers
|
||
13.
|
Top roller pressure
|
||
14.
|
Top Roller dia &codn
|
||
15.
|
Front top roller offset
|
||
16.
|
Top roller stgs
|
||
17.
|
Nose bar stgs
|
||
18.
|
Lappet hook stgs
|
||
19.
|
Fn of builder motion
|
||
20.
|
Traveller clearer stgs
|
||
21.
|
SPL &Lappet gauges
|
||
22.
|
Lappet height gauges
|
||
23.
|
Ring rail levl
|
||
24.
|
Spl buttons
|
||
25.
|
Cop content & Dia
|
||
26.
|
Spl tape tensions
|
||
27.
|
Spl tape allignment
|
||
28.
|
Main belt condn
|
||
29.
|
Tin roller Brg Lubrication
|
||
30.
|
Spl oil levl
|
||
31.
|
Total Idles
|
||
32.
|
Count CV%
|
||
33.
|
Strength CV%
|
||
34.
|
Yarn CSP
|
||
35.
|
Breaks/100Spl Hrs
|
FOR
ASSISTANCE CALL +91-98431-79009